Managed to take out a whole industrial estate, dead short on the 11KV/415V kiosk sub, was standing in front of the cabinet, though did put the very heavy rear panels on the 700KVA UPS. The boom comes later, what you get first is a hissing rush, sort of like pfffft then the boom, was showered with hot metal though mostly unharmed, the factory manager though i was dead... shock wave was also well prevalent. We used mine trailing cable to hook onto the sub direct feed, input current was static at 2KA on a six pulse rectifier, should have been a 12 pulse Star Delta transformer input. Drew up to 4KA on battery charge and load support... Poms built the machine and we commissioned it... there were even bigger multi units... 500VDC DC link voltage and better part of 20 ton of batteries... spanners actually have finite resistance, go red and then white while fused on the copper bus bar... noticed it when the trades assist dropped the uninsulated spanner across the DC link... did tell him to run if anything goes wrong, that he did...run .. real quick. Pity he did not pay attention when i told him to wrap his tools, then he retrieved a different spanner when i was out of the room... excitement is where you find it... or run when it arrives.. j