After hemming and hawing too long, looking for a more clever solution, I've decided to mount Executive panniers on my RGA Jota the same way the factory (and dealers, I suppose) did on RGSs, by milling a flat at the upper rear of the footpeg carrier and fabricating the same kind of stand-off for the 10mm stiffening bar that's used on the rack itself. It looks to me like that milling operation (if done perpendicular to the back face of the carrier) is likely to break completely through the outer skin of the carrier on the bottom, and then the load will be carried on a washer that spans several of the reinforcing ribs behind. Or is the milling done at an angle so as not to break through, and the back edge of the support ring on the standoff is beveled instead? Somewhere on the internet there is probably a reproduction of the instructions given to dealers on how to do this.

