D
dja981
Guest
sfcpiet said:Normally a 5-minute job... ok, 8, with fitting of the new bearings.
piet
Does that include removing the swinging arm?
Dave
sfcpiet said:Normally a 5-minute job... ok, 8, with fitting of the new bearings.
piet
dja981 said:Does that include removing the swinging arm?
Dave
chrisk said:Last night I pulled 750 generator parts out of the molasses, not ready yet.
Any one know the length of the two screws, that hold it together and if they are M5 or M6?
Also after a source for the insulators.
phil37 said:Back in the eighties there was a clever bloke called Leon Moss (LEDAR) who developed an air jet corrector kit that could alter the shape of the fuel slope so that you could richen or weaken it at (almost) chosen revs. To try and make the simple D/O's into an air bleeding type of carb I started similar work on the D/O's using a proper emulsion tube rather than a needle jet and a threaded jet in air inlet to the emulsion tube - initial results were promising, but the fire at Motodd ended the work prematurely. We did do a successful "powerjet" system - but only useable on the dyno.! I have got a pair of D/O's that Brettoni was working on (allegedly) and it looks like he had a similar idea to mine. - I'll try them on my 860 soon. - That 107BHp @6,200 Rpm must be a great motor - I'd like to gear it right up and have a lovely "lazy" ride. - regards - Phil
sfcpiet said:Screws are M6, Chris. Put one together with a nicely zinc-plated body today. Didn't think about measuring the screw length.
piet
Last I heard of Leon was that he had moved to Peterborough and opened a dyno facility.
phil37 said: