motoddrob
Hero member
- Location
- S/W Australia
Woodruff key, that's it. I raked my brains for that word but it didn't come to the fore front of my mind. Happens alot lately!!!!
It'll get worse.Woodruff key, that's it. I raked my brains for that word but it didn't come to the fore front of my mind. Happens alot lately!!!!
Iils has mentioned drilling out fly wheel rivets, just curious but that appears to have been bordering on complex engineering, does anyone recollect this procedure, what was the necessity or outcome. ThanksRob, well done re photo's. That stator plate is an early initial type, with mu-metal shielding on the reluctor pickups. What concerned me also as to what to expect from the magnetic flywheel, inducing unwanted impulse signals into the ignition timing signal chain. Actually measured the interference signals on a running motor, for the mu-metal shielded and non shielded part that followed from later production types. Becomes somewhat tedious the outcomes, of those measurements.
For others, Notice there are 4 terminals on the upper coil ( lower assembly in the photo ), that is the "regulator", feeding the diode bridge which used to catch fire, hard to imagine there was enough grunt to cause a fire, yet catch fire they did, under spec'ed diode bridge. Low PIV rating i would think, not that it matters these days......
Around the same time i designed a low loss IIS RR which was very elaborate as a prototype, did work, though expensive to produce, quickly deleted once ex Kwaka RR SH530 from wrecked learner bikes were sourced, between Redax and myself we bought every available flywheel/stator/RR kit plus usable TEK reluctor pickups across Australia. Very cost effective once Red/Maxene and myself, bought entire kits from the wreckers, RR worked out at around AU$35. Riveting.... well actually it was, drilling out the hot pressed rivits in the Kwaka flywheel.... HTH j.