Robin Webster
Hero member
- Location
- Silverstone
I don’t know that as yet.Were the valve clearances ok? Doesn’t look like pistons were cause of low compression.
I don’t know that as yet.Were the valve clearances ok? Doesn’t look like pistons were cause of low compression.
It’s not, piston’s are 76’s I think.That looks like a 1200 80mm bore.
A little higher up in the thread it says the pistons I was asked to order are +1. The valve stems and guide were very loose in relation to each other, the valves could be wobbled around in the guides. The new guides have to be honed to match the valve stems. The valve seats appear to be pock marked with corrosion. Hope we can get away with them not being replaced.It will be interesting to see what your machinist finds about the bores, and if they are slightly bowed out in the centers like mine were. Did you get slightly oversize pistons for a rebore? And how do the valve guides and seats appear?
Wolfgang knows his stuff, I’d be amazed if he had got it wrong.Are those pistons all the same? Two look like Jota pistons and one doesn't, could be the photos though.
Ah!I meant the old ones Robin
Frame and cases match. Engine? Who knows after 49 years.There appears to be some conflicting opinions about the engine- do the serial numbers match the frame and what's the measurement of the bores? Could it be that the cylinder and head were swapped with something else?
Ross used to sell the Laverda pistons with their own branded rings ( not saying they physically made the rings).I bought forged Ross pistons for my 750 from Wolfgang that came with Ross rings so there must be a reason yours are from Japan since yours is a triple. Wolfgang says Ross is good quality and best of luck on your rebuild and keep us posted.
I haven’t seen it, but AFAIK it is built up all bar the split link.I had a cam chain on a 1200 that I couldn't find a suitable new split link for. In the end I bought a new chain.
Are they fitting the old one?
Jo, if someone says to me, It will be three weeks and then in three weeks says, Oh it’s still at the engineers - it will be next week! Then that goes on and on for a couple of months then they get it back and say Yours is the third engine we will build this week, you should get it for Saturday and I rock up to pick it up and they say Sorry not done yet. I leave it 10 days and say what is the progress and their reply is stop bothering us - I say stop giving me false dates. OK 100% it will be next week then they say Oh it’s gone back to the engineers as they didn’t do the valve seats - It will be three days! Then the engineering company have it 3 weeks.From April to now, it's been just three months, which isn't IMHO really long for a complete engine overhaul.
The camshaft chain link should, of course, match the existing chain. Or you can install a new one with a new link. Your mechanic should know the relevant sources in the UK; perhaps contact the chainman.