sick of wiring repairs on the 79 1200, took a break from wiring, to fit the side stand conversion.
first photo is bashing the old side stand off from the bottom front engine mount, it had come loose so many times I had tack welded it in place years ago.....

fitting the side stand conversion requires sawing off the extended tab on the center stand. Hacksawed it off and kept the cut off piece to weld back on if ever necessary. I am hoping to mainly use the new side stand most of the time now anyway.
fitting the side stand conversion together into place with the left side shift conversion plus rear sets is a little fiddly, had to do some "fettling" to make things fit with enough clearances for the shifter to work properly, haven't test ridden yet
I am guessing maybe another two or three hours finishing off the re wiring, hoping to do that tomorrow then take a test ride. There are still little white spots all over the bike presumably from the fire suppressant foam. In hte last photo, look at the frame gusset plate just above the side stand adaptor plate, looks like little white specks. They are sticky and are everywhere. Likely going to trailer the bike to a commercial pressure wash bay, spray and soak the bike in solvent and surfactants, let it all soak for a bit, then give it a good deep pressure cleaning. Then the bike will hopefully be ready for this riding season if I have completed the rewiring correctly.