Finally I got a bit of time to play bikes today. The new bike lift turned up Wednesday, Today I built it and moved bikes around in the shed to bget the 1200 up on it. With the help of a mate Toni, I got the papers sorted for the 1200, which means we have a year to get it finished, I’m hoping four months, the plan is strip the 1200, paint the frame Miguel and I are going to try and cerakote it, I have a spare swing arm, that I may or may not brace, to use , and then move everything over from the Jota to the 1200, and then turn the Jota back into a standard looking Jota, color to be decided. But for you Paul, and just for you it won’t be. Orange.
The engines will be mixed up for a bit with the pristinely built Jota engine from Red going into the 1200, until I can send the 1200 engine to Red, for a birthday, and then it will go in the 1200 when it’s back, and the Jota engine will go back to the Jota and all the numbers frames and engine will be match match again.
this is the only way I can get both bikes legally registered here in Spain, Because of rules, and rules must I guess, A bit of a ball ache, but it is what it is, and I get a second lav back on the road almost at the same time as the first. Then it will be time to,work of on the SF2 race bike, and the SF3.
in any case it was bloody nice sitting in the shed with a Dark and Stormy tonight, looking at my toys